Projects, clients and tasks
Time is tracked to a task on a project, and every project belongs to a client. Clients hold the currency and the invoice contacts, projects hold the rate and budget, and tasks are one firm-wide list.
How the pieces fit
| Item | What it holds | Who changes it |
|---|---|---|
| Client | Name, currency, address, contacts, and the optional status page. | Owners and managers |
| Project | Client, name, optional code, billable or not, rate, budget, and which tasks and people are on it. | Owners and managers |
| Task | A name and whether it is billable by default. One list for the whole firm, switched on per project. | Owners and managers |
The Projects page has a switch at the top: Projects, Clients and Tasks. Members see only Projects.
Clients
On the Clients tab, choose New client (or press c). The list shows each client’s active project count, hours this month and unbilled amount, and a “Status page on” tag where one is shared.
- Name and Currency. Every project of the client is priced in this currency.
- Address. Printed on invoices.
- Contacts. Name and email each. Tick Gets invoices on the ones who should receive them: invoices are sent to primary contacts.
- Client status page. See Client status page.
Projects
Open the dialog
Choose New project or press c on the Projects tab. To change one later, open it and choose Edit (or press e).Client, name and code
Pick the Client, or New client… to make one on the spot with a name and currency. Name is required. Code is optional (up to 40 characters); it is shown beside the name and searched by the picker and the project search.Billable
The Billable box. A non-billable project tracks time but never invoices it, and the rate section is hidden.Rates and budget
Choose a rate mode and optionally a budget. See Rates and Budgets and alerts.Tasks and people
Tick the tasks people can track to, and the people on the project. Tick Manages beside a person to make them a manager of the project, who gets its budget emails. A new project starts with every active task and everyone switched on. At least one task is required.Save
Choose Create project or Save project. The button reads “Saving…” while it works. If something is wrong, your entries stay in the form and the reason shows at the bottom.
The project list
Projects are grouped by client, with the client’s unbilled total on the group heading (owners and managers). Each row shows the name, code, any Non-billable or Archived tag, a budget bar, hours this month and the unbilled amount. Search (/) matches client, project or code. Show archived appears only when something is archived.
The project page
Open a project to see its budget bar and, for monthly budgets, the Monthly statement (see Retainers). Below are this month, total hours, billable share, unbilled amount with a Create invoice link, the last 8 weeks, the team, the tasks and the latest 12 entries. People who tracked this month but are no longer on the project show “Not on project”.
Tasks
On the Tasks tab, type a name and choose Add task. Names can be up to 120 characters and must be unique, ignoring capitals (“There’s already a task called Design.”). Rename a task in place: Enter saves, Escape puts the old name back. The Billable by default box decides whether new entries on that task start as billable; the Projects column counts the active projects using it.
Archiving a task keeps it on past time and in reports but stops it being picked for new time. Archived tasks can’t be switched on for a project until you unarchive them.
Expense categories
The Categories tab works the same way for expenses: add, rename in place, archive, and a Billable by default box that sets whether new expenses in that category start as billable. A new firm starts with Travel, Meals, Lodging, Software, Materials and Other. The Expenses column counts the expenses in each. See Expenses.
Each project page also has an Expenses section with the project's total, the unbilled amount, the latest expenses and a Log an expense button.
Taking a task or person off a project
Unticking a task or person in the project dialog switches them off; nothing is deleted. People can no longer start new time on a switched-off task, but old entries stay editable and keep their names, and any per-task or per-person rate is kept for that past time. Ticking them again brings them back.
What members see
A member sees only the projects they are on, with hours only: no rates, budgets in money (only a share such as “62% used”), unbilled amounts or other people’s time. A member who opens a project they are not on gets “Project not found”, so they cannot tell whether it exists. Owners and managers see everything. See Team and roles.
Archive and delete
| Action | Effect | Rule |
|---|---|---|
| Archive a project | It no longer takes new time. Its history stays in reports and on invoices. | Reversible with Unarchive. Unarchiving is refused while its client is archived. |
| Delete a project | Removes it. Found under the ⋯ menu on the project page. | Only offered when the project has no time at all, including entries deleted in the last 30 days. Otherwise archive it. |
| Archive a client | Hides it. Its status page turns off. | Refused while it has active projects: “This client has 3 active projects. Archive them first.” |
| Archive a task | Stays on past time, can’t be picked for new time. | Reversible. |
When something goes wrong
- “Switch on at least one task”. Add a task on the Tasks tab first, then tick it in the project.
- A project is missing from the picker. It is archived, you are not on it, or its tasks are switched off.
- “Enter the budget amount, or choose None.” A budget needs an amount greater than zero.