Every project has one rate mode: one rate for the project, a rate per task, or a rate per person. The rate on an entry is worked out from the mode, so the rate that wins is always the most specific one that is set, falling back to the project’s rate.
The three modes
Set the mode in the project dialog, under Rates, with the segmented control One rate, Per task or Per person. The section only appears when the project is Billable. Rates are per hour, in the client’s currency.
| Mode | Rate used for an entry, first one set wins |
|---|---|
| One rate | The project’s rate. |
| Per task | 1. The rate set for that task on this project. 2. The project’s Default rate per hour. |
| Per person | 1. The rate set for that person on this project. 2. The person’s usual rate (Settings, Team, Rate). 3. The project’s Default rate per hour. |
In Per task and Per person modes the project rate field is relabelled Default rate per hour, and it is the fallback for tasks or people with no rate of their own. In Per person mode the person’s usual rate shows as the placeholder in their rate box.
Example
A project in Per person mode has a default rate of $140, Maya set to $180 on the project, and Tomás with no project rate but a usual rate of $160 in Team. Maya’s time is $180 an hour. Tomás’s is $160. Priya, who has neither, gets $140. (These numbers are an illustration.)
When there is no rate
- A non-billable project, or an entry marked not billable, has no rate and no amount.
- A billable entry whose mode finds no rate at all (nothing set in the chain above) has no rate. Its amount is shown as nothing and it is left off new invoices until you set one. The invoice draft screen lists the projects that have entries left out for this reason, and a draft that includes such an entry is refused with “… has no rate for some entries. Set a rate on the project first.”
- Empty rate boxes are fine: a blank means “use the next one in the chain”.
When a rate change applies
Rates are not stored on entries. They are looked up when you view a project, make a report or build an invoice, so changing a rate changes the amount on all unbilled time on that project, including time already tracked. It does not change:
- an invoice that has been created: project, rate and client edits never change an issued invoice;
- time that has already gone onto an invoice.
A draft invoice keeps the lines it was built with until you rebuild its time lines from the entries (the draft has a refresh for that), so after changing a rate, rebuild any open draft. See Invoices.
Setting a person’s usual rate
Owners set it in Settings, Team, in the Rate column. It is the person’s default billable rate per hour and applies in Per person projects with no rate for them. It is entered in your firm’s currency. For a client billed in a different currency, set the person’s rate on the project instead, so the amount is in the client’s currency.
Removed tasks and people keep their rates
If you take a task or person off a project, their rate on that project is kept, so their earlier unbilled time is still priced the same way. See Projects, clients and tasks.
Rounding
Rates are applied to the hours as they appear on an invoice, after the rounding set in Firm settings (no rounding, or up or to the nearest 1, 5, 6, 10, 15 or 30 minutes). Stored entries are never changed. An invoice line’s amount is its hours times its rate; a line that would mix two different rates is split into two lines.
Who sees rates
Owners and managers. Members never see rates or money anywhere, including their own time.
Rates from an import
An import proposes a rate mode for each new project from your old tool. See Import.